Jansen Group

St-Mariaziekenhuis (Saint Mary Hospital), Halle

At St-Mariaziekenhuis, CSB has carried out the study, design and construction of a hospital pharmacy. It has an area of about 110 m² for sterile preparations, pharmaceutical compounding and cytostatics from ISO 5 to ISO 8.

CSB has carried out the entire project. No architect or engineering office was appointed. The total amount of the works was about 550.000 €.